From another point of view. The stainless bowl at the top is hanging from the metal buildings rafters and is adjustable via a nylon string. You can see the box that houses the rotary spark-gap under the coil with its 1/4 hp motor. There is a copper pipe that passes from the secondary through to the high voltage terminal with an iron nail at the end.

[Back]    [Home]     [Next]